Incorporation of the ECSC in the EC budget
1994/2140(INI)
Adopting the report by Mr Joan COLOM I NAVAL (PSE, E), the European Parliament voted in
favour of incorporating the ECSC into the Community budget, given that the Treaty establishing
the ECSC is due to expire in 2002. It reiterated its view that activities such as research and social
and regional measures should be phased out of the ECSC framework and phased into the
appropriate EU budgetary framework. The European Parliament, in its capacity as a legislative
and budgetary authority, should be closely involved in the process. The European Commission
was called on to produce a study (which was due in spring 1996) setting out a detailed picture of
the current situation and the prospects for ECSC reserves. It was also requested to provide
information about borrowing and lending operations.
Furthermore, in anticipation of enlargement, it also needs to say what arrangements it will make
under the PHARE and TACIS programmes to enable the coal and steel industries in the CEECs
to complete the necessary transition. The report believed that the balances of remaining ECSC
assets should be transferred to the Union and could be administered by an EU body. The
Commission was therefore called on to draw up a study with a view to establishing a European
coal and steel foundation or agency, the initial capital of which would consist of the remaining
ECSC appropriations and the operational and administrative expenditure of which would be
covered in the EU budget. Interest earned on the capital would be paid into the EU budget and
used to cofinance multiannual research programmes relating to coal and steel and the social