Common fisheries policy: monitoring. Report 1995
1997/2140(COS)
OBJECTIVE: submission of the second report from the Commission on Monitoring the Common
Fisheries Policy (1995).
SUBSTANCE: the report complies with a formal obligation laid down by Article 35 of Regulation
(EEC) No 2847/93 and with a vital need for transparency. The report is the second of its kind, and
contains an overview of monitoring activities in 1995. It provides comprehensive reports on the
monitoring systems in Finland and Sweden, which joined the Union in 1995, as well as
consolidating and updating the first report.
The Commission concludes that the adoption of an effective monitoring system, at all levels of
responsibility, is a conditio sine qua non for the successful implementation of the common fisheries
policy (CFP). The further reduction of fleet capacity, the wider introduction of fishing effort
limitations and the introduction of modern technologies for control purposes will ensure that
inspection is as economical as possible. Against this background, the Commission notes that the
conclusions of the first report remain valid.
It adds that cooperation between Member States needs to be developed in the following areas:
- greater transparency of inspection practices and effective and uniform application of Community
rules;
- better mutual understanding of fisheries enforcement in each Member State;
- the intensification of operational cooperation among the coastal Member State, the flag Member
State and, where appropriate, the Member State of landing, transit and marketing of fisheries
products, in the inspection and monitoring of fishing activity and related activities;
- the promotion by Member States of better communication and improved understanding among the
national control authorities, the scientific community and the fishing industries;
- coordination among Member States in the application of research and new technologies in the field
of supervision.
Against this background, the Commission will support any initiatives enhancing cooperation taken
by Member States, including by the financing, on a priority basis, of projects in accordance with
Decision 95/527/EC. Furthermore, the Commission will examine as soon as possible whether the
current control provisions need to be reinforced and, where appropriate, it will propose amendments.
�